Analysis Waste Level of Column Reinforcement Work Planning with Software Cutting Optimization

Authors

  • Sulthanul Auliya Jagad Universitas Pembangunan Nasional "Veteran" Jawa Timur
  • I Nyoman Dita Pahang Putra Universitas Pembangunan Nasional "Veteran" Jawa Timur

DOI:

https://doi.org/10.31154/cogito.v10i2.813.433-446

Keywords:

Waste Level, Bar Bending SChedule, Software Cutting Optimization Pro

Abstract

In the era of globalization, construction development in Indonesia has experienced significant acceleration, accompanied by innovation in its implementation methods. One of the main problems in construction projects is material waste, especially in column work. This study aims to analyze the level of waste in column reinforcement work by applying the cutting optimization method using Cutting Optimization Pro software and analyzing the diameter of the reinforcement that produces the greatest waste. The research method used is quantitative by analyzing secondary data through shop drawings and detailed standards from construction projects. The study was conducted on column work from Ground to Floor 5 by calculating material requirements using the Bar Bending Schedule and optimizing cutting patterns through Cutting Optimization Pro Software. The results show that the lowest percentage of waste D16 is 0%, the highest at Ø8 is 2.653%, and the overall average waste is 0.916%. This study provides new insights into the importance of innovation in material planning and management in the construction industry. By utilizing optimization software, contractors can improve efficiency and reduce the impact of material waste. This study is expected to be a reference for contractors in adopting new technologies in the management of material waste.

References

S. F. Korompot, J. Tjakra, and J. B. Mangare, "Analisis Perbandingan Waste Pada Penulangan Balok Dengan Menggunakan Metode Konvensional Dan Software Cutting Optimization Pro," TEKNO, vol. 22, no. 87, 2024, doi: 10.35793/jts.v22i87.54737.

Mahyuddin et al., Manajemen Proyek Konstruksi Yayasan Kita Menulis, 2023.

E. Q. Chaise, K. S. Lians, and R. S. Alifen, "Analisa Sisa Material pada Pekerjaan Struktur Konstruksi Beton Bertulang " Jurnal Dimensi Pratama Teknik Sipil, vol. 9, no. 2, 2020. [Online]. Available: https://publication.petra.ac.id/index.php/teknik-sipil/article/view/10664.

M. E. Silaban and A. H. Pamungkas, "Analisis Waste Material menggunakan Fault Tree Analys pada Pekerjaan Concrete Barrier," TECHNOLOGIC, vol. 14, no. 2, 2023, doi: 10.52453/t.v14i2.363.

A. Asnudin, "Pengendalian Sisa Material Konstruksi pada Pembangunan Rumah Tinggal " Majalah Ilmiah Mektek, vol. 12, no. 3, 2010. [Online]. Available: https://scholar.google.com/scholar?hl=id&as_sdt=0%2C5&q=Pengendalian+Sisa+Material+Konstruksi+pada+Pembangunan+Rumah+Tinggal+&btnG=.

I. W. Muka, M. A. Widyatmika, and I. M. N. Antara, "Analisis Perbandingan Waste Besi Tulangan etode Konvensional dengan Software Cutting Optimization Pro " TEKNIKA, vol. 15, no. 2, 2020, doi: 10.26623/teknika.v15i2.2852.

I. G. P. A. S. Putra, G. A. P. C. Dharmayanti, and A. A. D. P. Dewi, "Penanganan Waste Material pada Proyek Konstruksi Gedung Bertingkat " Jurnal Spektran, vol. 6, no. 2, 2018, doi: 10.24843/SPEKTRAN.2018.v06.i02.

S. Intan, R. S. Alifen, and L. S. Arijanto, "Analisa dan Evaluasi Sisa Material Konstruksi Sumber Penyebab Kuantitas dan Biaya " Civil Engineering Dimension, vol. 7, no. 1, 2005, doi: 10.9744/ced.7.1.pp.%2036-45.

J. B. Negara and M. Suryanto, "Analisis Sisa Material Besi Tulangan pada Proyek Konstruksi Bangunan Gedung " Jurnal Rekats vol. 7, no. 4, 2019. [Online]. Available: https://ejournal.unesa.ac.id/index.php/rekayasa-teknik-sipil/article/view/31440.

S. O. Putri and Firmansyah, "The Efficiency of Steel Material as Buildings Construction," in International Conference on Informatics Engineering, Science & Technology, Bandung, 2020, vol. 879, no. 1: IOP Conference Series Materials Science and Engineering, doi: 10.1088/1757-899X/879/1/012148.

I. G. N. E. Partama, I. G. M. Sudika, and E. L. B. Saputra, "Analisis Sisa Besi Tulangan Menggunakan Software Cutting Optimization Pro pad Konstruksi Gedung (Studi Kasus: Proyek Pembangunan Villa Stilo, Tibubeneng, Kec. Kuta Utara, Kab. Badung-Bali)," Jurnal Teknik Gradien, vol. 15, no. 2, pp. 30-38, 2023, doi: 10.47329/teknik_gradien.v15i02.1075.

D. Kurniawan and M. Ujianto, "Optimasi Perhitungan Kebutuhan Tulangan dan Tulangan sisa (Waste Shear Wall menggunakan Software Cutting Optimization Pro pada Proyek Pembangunan Gedung MRT Jakarta " Prosiding Seminar Nasional Teknik Sipil 2023 Fakultas Teknik Universitas Muhammadiyah Surakarta 2023. [Online]. Available: https://proceedings.ums.ac.id/index.php/sipil/article/view/2770.

N. K. S. E. Yuni, N. P. I. Yuliana, and I. K. Sudiarta, "Analisis Waste Material Besi dalam Upaya Pengendalian Sisa Material Konstruksi," Jurnal Teknik Sipil Terapan, vol. 5, no. 1, 2023, doi: 10.47600/jtst.v5i1.561.

S. S. Nasautama and M. Sitompul, "Analisis Kebutuhan Tulangan dan Tulangan Sisa (Waste) Pekerjaan Struktur Kolom, Balok dan Pelat Lantai Proyek Pembangunan Pasar Baru Kabupaten Mandailing Natal " PORTAL: Jurnal Teknik Sipil, vol. 14, 2, 2022, doi: 10.30811/portal.v14i2.

I. A. P. S. Mahapatni and I. K. I. Juliana, "Analisis Waste Level dan Waste Cost Bekisting dan Pembesian pada Pekerjaan Struktur Proyek Konstruksi (Studi Kasus: Pembangunan Gedung SMPN 4 Sukawati)," Widya Teknik, vol. 17, no. 1, 2022, doi: 10.33508/wt.v17i1.

G.’Abidah and I. P. A. Wiguna, "Perbandingan Kombinasi Pemotongan Pembesian dengan Metode Manual Bar Bending Schedule dan Tekla Structures " Jurnak Teknik ITS vol. 12, 2, 2023, doi: 10.12962/j23373539.v12i2.112943.

M. W. Jayantari, P. S. T. Dewi, and P. G. A. Yoga, "Analisa Perbandingan Volume Dan BiayaBar Bending Schedule Dengan Metode SNI-2847:2013 DanBS 8666:2005 Pada Proyek Pembangunan Kantor Pacto, Denpasar," Reinforcement Review in Civil Engineering Studies and Management, vol. 1, no. 2, 2022, doi: 10.38043/reinforcement.v1i2.4102.

S. Z. Mauliddiana, Anisah, and A. Maulana, "Studi Literatur Penggunaan Perangkat Implementasi Building Information Modeling (BIM) dalam Penyelenggaraan Konstruksi di Indonesia," Prosiding Seminar Pendidikan Kejuruan dan Teknik Sipil (E-Journal), vol. 1, 2023. [Online]. Available: https://journal.unj.ac.id/unj/index.php/spkts/article/view/35965/15633.

R. Immanuel and B. E. Yuwono, "Kematangan Shop DrawingSebagai Penentu Pekerjaan Ulang (Rework) Proyek Konstruksi," Construction Engineering and Susainable Development, vol. 3, no. 1, 2020, doi: 10.25105/cesd.v3i1.8023.

M. S. D. Riyanto and M. Solikin, "Analisis Perbandingan Waste Metode Distribusi dengan Software Cutting Optimization Pro pada Pekerjaan Penulangan Pilecap (Studi KAsus: Proyek XYZ Semarang) NALISIS PERBANDINGAN WASTE METODE DISTRIBUSI DENGAN " Prosiding Seminar Nasional Teknik Sipil 2023 Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Surakarta, 2023. [Online]. Available: https://proceedings.ums.ac.id/index.php/sipil/article/view/2694.

S. Kim, W-K. Hong and J-K. Joo, "Algorithms for Reducing the Waste Rate of Reinforcement Bars," Journal of Asian Architecture and Building Engineering, vol. 3, no. 1, 2004, doi: 10.3130/jaabe.3.17.

C. S. Poon, A. T. W. Yu, and L. H. Ng, "On-site Sorting of Construction and Demolition Waste in Hong Kong," Resources, Conservation and Recycling, vol. 32, pp. 157-172, 2001, doi: 10.1016/S0921-3449(01)00052-0.

Downloads

Published

2024-12-31

How to Cite

Jagad, S. A. ., & Putra, I. N. D. P. (2024). Analysis Waste Level of Column Reinforcement Work Planning with Software Cutting Optimization. CogITo Smart Journal, 10(2), 433–446. https://doi.org/10.31154/cogito.v10i2.813.433-446